UCC25230EVM-662

Mfr. #: UCC25230EVM-662
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR UCC25230-662
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: UCC25230EVM-662 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC25230EVM-662 Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Voltage Regulators - Switching Regulators The DC/DC, Step Down is the Main-Purpose. 36 V ~ 72 V voltage input This product features 'Frequency-Switching' at 200kHz for optimal performance. Output voltage: 3.3V Buck regulator topology 100W Included item: Board. IC package type: UCC25230, UCC28250 Board type: Fully Populated. The product has 1, Isolated outputs. Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C Output voltage: 9 V This tool is designed for the UCC25230. Input Voltage Range: 12 V to 100 V Output current: 200 mA

UCC25230EVM-662 Image

UCC25230EVM-662

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC25230EVM-662 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Modules
  • Type Voltage Regulators - Switching Regulators
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 36 V ~ 72 V
  • Frequency-Switching 200kHz
  • Current-Output 30A
  • Voltage-Output 3.3V
  • Regulator-Topology Buck
  • Power-Output 100W
  • Supplied-Contents Board
  • Utilized-IC-Part UCC25230, UCC28250
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Isolated
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Output-Voltage 9 V
  • Tool-Is-For-Evaluation-Of UCC25230
  • Input-Voltage 12 V to 100 V
  • Output-Current 200 mA

UCC25230EVM-662

UCC25230EVM-662 Specifications

UCC25230EVM-662 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed DC/DC, Step Down

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 36 V ~ 72 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 200kHz

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 3.3V

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is 100W.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is UCC25230, UCC28250.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is 1, Isolated.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 9 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is UCC25230.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 12 V to 100 V

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 200 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
114,63 $
114,63 $
10
108,90 $
1 088,98 $
100
103,17 $
10 316,70 $
500
97,44 $
48 717,75 $
1000
91,70 $
91 704,00 $
Top