VCA5807EVM

Mfr. #: VCA5807EVM
Hersteller: Texas Instruments
Beschreibung: MODULE EVAL FOR VCA5807
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: VCA5807EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA5807EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Instrumentation Amplifiers Bulk is the packaging method for this product This product is designed VCA5807 amplifier. Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 3.15 V ~ 3.6 V, 4.75 V ~ 5.5 V The 800kHz The -. Current-Output-Channel is 20mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA5807 Board type: Fully Populated. The product has 8 - Octal channel per IC. This tool is designed for the VCA5807. USB interface type

VCA5807EVM Image

VCA5807EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA5807EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Modules
  • Type Instrumentation Amplifiers
  • Packaging Bulk
  • For-Use-With VCA5807
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 3.15 V ~ 3.6 V, 4.75 V ~ 5.5 V
  • -3db-Bandwidth 800kHz
  • Slew-Rate -
  • Current-Output-Channel 20mA
  • Amplifier-Type Variable Gain
  • Supplied-Contents Board
  • Utilized-IC-Part VCA5807
  • Board-Type Fully Populated
  • Channels-per-IC 8 - Octal
  • Current-Supply-Main-IC -
  • Tool-Is-For-Evaluation-Of VCA5807
  • Interface-Type USB

VCA5807EVM

VCA5807EVM Specifications

VCA5807EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Instrumentation Amplifiers

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed VCA5807

  • A: At what frequency does the Operating-Temperature?

    Q: The product Operating-Temperature is -40°C ~ 85°C.

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is Differential.

  • A: What is the Voltage-Supply-Single-Dual of the product?

    Q: The Voltage-Supply-Single-Dual of the product is 3.15 V ~ 3.6 V, 4.75 V ~ 5.5 V.

  • A: Is the cutoff frequency of the product -3db-Bandwidth?

    Q: Yes, the product's -3db-Bandwidth is indeed 800kHz

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is -.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 20mA.

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Variable Gain

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is VCA5807.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 8 - Octal

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed VCA5807

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
298,50 $
298,50 $
10
283,58 $
2 835,75 $
100
268,65 $
26 865,00 $
500
253,72 $
126 862,50 $
1000
238,80 $
238 800,00 $
Top